Offshornik UA

Главная | Регистрация | Вход
Среда, 22.01.2025, 23:59
Приветствую Вас Гость | RSS
 
                   GISMETEO: Погода по г.Херсон
Меню сайта
Вход

Add to network
Vote
Rate my site
Всего ответов: 45
Block title
Block content
Statistics

Онлайн всего: 2
Гостей: 2
Пользователей: 0

Главная » Статьи » My articles

Drilling Project Engineer
Drilling Engineer
Provide specialist support and advice to the drilling, completion, well testing and well intervention operations, define requirements for drilling locations, drilling rigs and ancillary equipment.

Responsibilities:
Identify requirements for the drilling/work-over rigs minimum and optimum requirements and produce input for the design of the drilling installation to project engineering.

Monitor expenditures vs. budget; report overexpenditures.

Monitor and evaluate the effectiveness and performance of the equipment vs. the installation layout with needs for modifications, improvement of the HSE related issues and propose the most suitable corrective actions.

Qualifications & Experience:
Qualified to high school diploma level, or higher in technical/ engineering disciplines.

Required Competencies:
Knowledge of well operations rigs, materials and equipment needed for the typical well construction; drilling-testing-completion activities.

Knowledge of the international rules and procedures (API, ISO, etc.) as applicable to the design and manufacture of oilfield equipment.

Be capable of working in a multi-discipline, multi-national team environment.

Computer literate in MS Office: good command of both spoken and written English.
Location Brazil

Apply online

http://work-offshore.com/register.htm

Категория: My articles | Добавил: Sm@rt (02.12.2011)
Просмотров: 479 | Рейтинг: 0.0/0
Всего комментариев: 0
Добавлять комментарии могут только зарегистрированные пользователи.
[ Регистрация | Вход ]

Copyright MyCorp © 2025 |