Statistics |
Онлайн всего: 1 Гостей: 1 Пользователей: 0 |
|
| | |
|
DPO for FMEA sea trials
Reference: HM11 0710
Position: DPO
Location: INTERNATIONAL WATERS
Type: OFFSHORE VESSEL
Date Required: Saturday, December 31, 2011
Job Specification:
We currently have a requirement for two DPO’s to join a vessel for FMEA sea trials. The ship is a conventional Heavy Lift vessel (HLV) with two cranes each capable of lifting 1000tonnes, specialising in the transportation of large cargoes world-wide. The vessel was delivered in 2011, with a Class I DP notation. In order for my client to expand the operational capability of the vessel it was decided to upgrade her to DP Class II. The DP system is Kongsberg K-POS 21 The trips is due to commence on the 11th December and last for a two week period. Mobilisation will be from Hamburg and the trials will take place in the Baltic Sea. Requirements · BOSIET · OGUK · DP Certification
· Kongsberg familiar. hayley.milne@stena.com
|
Категория: My articles | Добавил: Sm@rt (07.12.2011)
|
Просмотров: 547
| Рейтинг: 0.0/0 |
Добавлять комментарии могут только зарегистрированные пользователи. [ Регистрация | Вход ]
| |
| | |
|
|